Short answer · 11 min read
Key takeaways
- A subpanel adds circuits where you need them. It does not add capacity to your service.
- The NEC generally allows one feeder or branch circuit to a detached building, so multi-circuit shops need a subpanel.
- At a detached building the neutral and ground stay separate, with ground rods or another electrode at the building.
- Direct-burial cable goes at least 24 inches deep; PVC conduit at least 18 inches under the NEC burial table.
- Garage and accessory building receptacles need GFCI protection under the 2023 NEC.
A subpanel is a second breaker panel fed by a single large circuit, called a feeder, from your main panel. It puts breakers close to the loads, gives you room for new circuits and lets you shut the whole building off from one place. We see a lot of these in Fallston and Jarrettsville, where one-acre lots, detached garages and pole barns are common, so the long-feeder questions get extra attention below.
Do you need a subpanel for a garage or workshop?
The rule that tips many detached buildings toward a subpanel is NEC 225.30, which generally allows only one feeder or one branch circuit to supply a separate building. A multiwire branch circuit counts as one circuit, which can give you two 120-volt circuits, but once you want a 240-volt tool plus lights plus outlets, a subpanel fed by one feeder is the clean way to do it.
Single circuit or subpanel? A quick guide
| What the building needs | Usually enough | Why |
|---|---|---|
| Lights and one or two outlets | One 20-amp circuit | Light loads, simple wiring |
| Lights, outlets and a freezer or fridge | One 20-amp circuit or a multiwire circuit | Still modest, but plan for growth |
| Bench tools, compressor, 240V saw | Subpanel, often 60A | Several circuits, including 240V |
| Heater or mini-split plus tools | Subpanel, 60A to 100A | Heating is a large continuous load |
| EV charger, welder or hot tub | Subpanel, often 100A | Each needs its own large circuit |
| Barn with stalls, water heaters, lighting | Subpanel, sized by load calculation | Many loads and long runs |
How big should a garage subpanel be?
Start by listing what will run together. A cabinet saw and a dust collector often run together; a welder and a heater might not. Continuous loads, the ones that run three hours or more, such as heaters and EV chargers, are sized at 125 percent, which is why a 48-amp charger needs a 60-amp circuit.
Common shop and garage loads (check the nameplate on yours)
| Equipment | Typical circuit | Notes |
|---|---|---|
| Lights and general outlets | 15A or 20A, 120V | GFCI protection required in garages |
| Air compressor, 2 to 5 HP | 20A to 30A, 240V | Motor starting current matters on long feeders |
| Cabinet table saw, 3 HP | 20A to 30A, 240V | Often runs with a dust collector |
| Electric shop heater, 5 kW | 30A, 240V | Continuous load |
| Stick or MIG welder | 30A to 50A, 240V | Follow the welder’s nameplate and manual |
| Level 2 EV charger, 48A | 60A, 240V | Continuous load, NEC Article 625 |
| Ductless mini-split | 15A to 25A, 240V | Sized from the unit’s minimum circuit ampacity |
What an electrician checks before sizing
Main service rating and existing load, open spaces in the main panel, the route and distance to the building, soil and obstacles along the trench path, what equipment you own and what you plan to add in the next few years, and whether an EV charger belongs in the garage. Our garage workshop electrical planning post helps you build that list.
What does the code require for a detached garage subpanel?
- Separate neutral and ground (NEC 250.32(B)): the equipment grounding conductor from the house bonds to the subpanel enclosure, and the neutral bar stays isolated. Bonding them at a subpanel puts normal neutral current on metal parts and ground paths.
- Grounding electrode (NEC 250.32(A)): the building gets its own electrode, usually two ground rods or a concrete-encased electrode in a new slab, connected to the subpanel.
- Disconnect at the building (NEC 225.31 and 225.32): a main breaker in the subpanel or a separate disconnect, outside or just inside the building where the feeder enters.
- GFCI protection (NEC 210.8(A)(2)): receptacles in garages and accessory buildings need GFCI protection, including many 240-volt receptacles under the 2023 code.
- Working space (NEC 110.26): a clear area at least 30 inches wide and 36 inches deep in front of the panel, so it doesn’t end up behind a workbench or shelving.
Wondering what your panel can handle?
How does the feeder get to a pole barn or detached garage?
Minimum cover depths from NEC Table 300.5 (common residential cases)
| Wiring method | Minimum depth | Notes |
|---|---|---|
| Direct-burial cable (UF or USE) | 24 inches | Needs protection where it rises out of the ground |
| PVC conduit | 18 inches | Common choice, allows future upgrades |
| Rigid or intermediate metal conduit | 6 inches | Used where digging deep is not practical |
| 120V, 20A or less, GFCI-protected residential branch circuit | 12 inches | Branch circuits only, not feeders |
Call Miss Utility before anyone digs
Maryland requires a locate request through Miss Utility before excavation. As of October 2026, the Miss Utility site says to contact them at least 3 full business days and no more than 12 business days before digging. Private lines, such as a feed to an existing barn or a well pump cable, are not marked by the utility locate, so tell your electrician where they run.
Does a subpanel add capacity to your electrical service?
That is why the first question for any shop or garage project is what the house service can spare. A 200-amp service in a gas-heated home usually has room for a 60 or 100-amp garage feeder. A 100-amp service with electric heat or an electric range may not, and the answer may be a service upgrade first. Our post on 100 amp vs 200 amp service shows which homes tend to fall where.
If the main panel is out of spaces but the service has capacity, a subpanel near the main panel can free up room for new circuits. If both are short, upgrading the service and panel together, then feeding the garage from the new panel, is often the cleaner path.
What does a garage subpanel installation look like?
1
Assess and plan
2
Permit and locate
3
Trench and conduit
4
Set the subpanel and electrodes
5
Pull wire and land circuits
6
Inspection and walkthrough
Start with a short video
Send a video of your main panel with the door open, the outside meter and the walk from the house to the garage or barn to 410-808-4215. Please Note: Quotes provided from videos are estimates based on the information shown. If additional issues, repairs, materials, or site conditions are discovered that were not visible in the video, the final cost may vary. A more detailed video helps ensure the most accurate quote.
Do you need a permit for a garage subpanel in Maryland?
Harford County’s Electrical Services Division lists garages and outbuildings among the work that needs an electrical permit, and permits are valid for 12 months from issue. Baltimore County requires a permit for all electrical work, including extending circuit wiring. Cecil County uses approved third-party inspection agencies, chosen when the permit is filed. Our Harford County electrical permit guide walks through each step.
Our subpanel installation service covers garages, workshops, pole barns and additions, and our garage, shed and workshop electrical page covers the circuits inside. If you’re on acreage in Fallston, our Fallston electrician page has more on the area’s detached garages and wells.
Related reading
FAQ
Questions homeowners ask
Can I run an extension cord or a buried cord to my detached garage instead?
Do I need a main breaker in the garage subpanel?
How far can a subpanel be from the main panel?
Can a garage subpanel feed an EV charger?
Will a subpanel help if my breakers keep tripping in the garage?
Sources
- Harford County: Electrical Services Division (permits for garages and outbuildings)
- Miss Utility: Maryland locate requests
- Baltimore County Permits, Approvals and Inspections: Electrical Inspections
- Cecil County: Electrical Permits and approved inspection agencies
- NFPA: NFPA 70, National Electrical Code (free access)